Home
Reconstruction Sponsorship

Reconstruction Items Available for Sponsorship

Nerul Sri Ayyappa Seva Samiti extends its gratitude towards the individuals who have shown overwhelming interest in sponsoring various items for the temple reconstruction. As per the estimate, the cost of construction is expected to be approximately Rs 3 crores. We are quite conscious of the magnitude of this noble task and are sure that it can be accomplished within the stipulated time frame but only with your whole hearted support by way of generous donations.

Devotees can sponsor the cost of construction of various items shown below. The Samiti will accept such donations on FIRST COME, FIRST SERVED BASIS. Participation in the construction of a temple is a rare opportunity for anyone in his lifetime as it is a divine venture. The temple culture is the culture of humanity for the survival of mankind.

Soliciting your wholehearted cooperation in the name ofLord Ayyappa

Board of Trustees
Nerul Sri Ayyappa Seva Samiti.

Item-wise estimate for the proposed temple complex is given below. The devotees/ well wishers may sponsor in full or part of the construction cost.

 
Sl# ITEM AMOUNT IN RUPEES
AYVAPPA DEVI SHIVA KRISHNA GANAPATHI SU8RAHMANIAN MUKHAMANDAPAM
A·2 PADMA PADUKAM LEFT SIDE 20000            
2A JAGATHI FRONT SIDE       16000 15000 15000  
2B JAGATHI LEFT SIDE 21000 15500 16000 16000 15000 15000 7000
2C JAGATHI RIGHT SIDE 21000 15500 16000 16000 15000 15000 7000
2D JAGATHI REAR SIDE 21000 15500 16000 16000 15000 15000 7000
3A KUMUDAM FRONT SIDE   20000          
3B KUMUDAM LEFT SIDE 22000 15000          
3D KUMUDAM REAR SIDE 22000 15000       10000  
4A GALAM FRONT SIDE     10000 10000   8000  
4B GALAM LEFT SIDE 10000   8000 8000   8000  
4C GALAM RIGHT SIDE     8000 8000   5000  
4D GALAM REAR SIDE 10000   8000 8000      
5A KAMPA FRONT SIDE   12000          
5B KAMPA LEFT SIDE   10000          
5C KAMPA RIGHT SIDE   10000          
5D KAMPA REAR SIDE   6000          
6A GALA FRONT SIDE 10000 10000   10000      
6B GALA LEFT SIDE 10000 7500   7500      
6C GALA RIGHT SIDE 10000 7500   7500      
6D GALA REAR SIDE 10000 7500   5000      
7A GALAPATI FRONT SIDE   15000       12000  
7B GALAPATI LEFT SIDE           8000  
7C GALAPATI RIGHT SIDE   10000       8000  
7D GALAPATI REAR SIDE           7500  
8A VEDIKA FRONT SIDE       25000   25000  
8B VEDIKA LEFT SIDE   15000 20000 20000 15000 15000  
8C VEDIKA RIGHT SIDE   15000 15000   15000 15000  
8D VEDIKA REAR SIDE     12000 12000 12000 12000  
10 OVUVYALI       250000      
11 STONE WALL ALL SIDES 450000 350000 210000 210000 200000 200000 220000
11A STONE WALL FOR ONE SQ . FT 1500 1500 1500 1500 1500 1500 1500
12B GHANDADWARA LEFT SIDE     10000        
12C GHANDADWARA RIGHT SIDE     10000        
16D GHANDADWARA REAR SIDE     10000        
14B PANJRA LEFT SIDE   20000          
14C PANJRA RIGHT SIDE   15000          
14D PANJRA REAR SIDE   6000          
15 THORANAM       20000      
16A KALLUTHARAM FRONT SIDE   10000 15000 15000   10000  
16B KALLUTHARAM LEFT SIDE   8000 10000 10000   10000  
16C KALLUTHARAM RIGHT SIDE   8000 10000 10000   10000  
16D KALLUTHARAM REAR SIDE   5000 5000 5000   5000  
17A KAPOTHAM FRONT SIDE   15000 15000     15000  
17B KAPOTHAM LEFT SIDE 20000 10000 10000 10000   10000  
17C KAPOTHAM RIGHT SIDE 20000 10000 10000 10000   10000  
17D KAPOTHAM REAR SIDE   5000 5OOO 5OOO      
18A GRAHAPINDI FRONT SIDE   8000          
18B GRAHAPINDI LEFT SIDE   5000          
22A THURAM FRONT SIDE   20000 25000   20000 20000 15000
22B THURAM LEFT SIDE 30000 15000 20000 20000   15000 10000
22C THURAM RIGHT SIDE 30000 15000 15000 15000 15000 15000 10000
22D THURAM REAR SIDE 25000 10000 10000 10000 10000 10000 10000
23

ROOF ALONG WITH WOOD &ORNAMENTAL WORK

1200000 675000 950000 950000 950000 950000 700000
23A

ROOF ALONG WITH WOOD &ORNAMENTAL WORK FOR ONE SQ. FT

2580 2500 2500 2500 2500 2500 2500
23B COPPER SHEET 300000 150000 150000 150000 150000 150000 150000
23C COPPER SHEET FOR ONE SQ. FT 2000 2000 2000 2000 2000 2000 2000
27 DEPASTAM8HAM           75000  
31A EXIT DOOR LEFT SIDE             10000
31B EXIT DOOR RIGHT SIDE             10000
31C EXIT DOOR REAR SIDE             10000
31D EXIT DOOR SHUTTER LEFT SIDE             20000
31E EXIT DOOR SHUTTER RIGHT SIDE             20000
31F EXIT DOOR SHUTTER REAR SIDE             20000

NOTE: DONATIONS BY CHEQUES/ DDs. MAY BE DRAWN IN FAVOUR OF NERUL SRI AYVAPPA SEVA SAMITI.

ALL DONATIONS ARE EXEMPTED FROM INCOME TAX u/s 80 G OF INCOME TAX Act, 1961.

BENEFITS TO THE DONORS/ SPONSORS

  1. Name of donors contributing Rs. 25,001 and above will be displayed permanently in the temple complex. The donor will receive a gold memento of Lord Ayyappa on the occasion of consecration of the new temple. Also, annually one day pooja will be performed in his/nominee's name on life time basis.

  2. Annually one day pooja in his/nominee's name will be performed on life time basis, for those who donate Rs.10,001 to Rs.25,OOO. They will also receive a silver memento of Lord Ayyappa.

  3. Donors contributing Rs.5001 to 10,000 will receive a Lord Ayyappa silver memento on the occasion of consecration of the new temple complex.
 
 
 

Copyright ©  Nerul Sri Ayyappa Seva Samiti (Regd)
This website is designed, developed, hosted & maintained by Nair Technologies Pvt Ltd Nerul, Navi Mumbai